This area shows any meter/well relationships belonging to a company. A company can have an unlimited number of meter/well relationships ('operator', 'producer', etc.). These relationships are meter/well level relationships and are optional entries. Each of these relationships is defined by a meter/well relationship type. These company relationship types, and additional information about them, can be found in the configuration meter/well relationship type area. The screen shot below is where you add, update or delete meter/well company relationships.
Add Meter/Well Relationship (button) - Click this button to add a meter/well relationship for the company.
View/Edit Grid Button (pencil) - Click this next to the applicable meter/well relationship in order to change any of the information relevant to the meter/well relationship.
Delete Grid Button (red x) - Click this next to the applicable meter/well relationship that you want to permanently delete. When you delete a meter/well relationship, then only the specific meter/well company relationship is removed (the company AND the meter/well relationship type are/can still be used by other companies). Important note: You will be presented with a confirmation ("Are you sure...?") dialog box prior to deletion.
The following shows the meter/well relationship detail which you are presented with when adding or updating a company meter/well relationship.
Relationship (drop down list box) - This is a required field. This indicates the type to use for the relationship. See the configuration meter/well relationship type setup area for creating/updating meter/well relationship types. This item also includes a quick add icon for setting these types up directly from this screen (if you have appropriate security).
Effective From (date popup) - This is a required field. It will default to '01/01/1800'. This should be left at the default value unless date effectiveness for this meter/well relationship is important.
Effective Thru (date popup) - This is a required field. It will default to '12/31/3000'. This should be left at the default value unless date effectiveness for this meter/well relationship is important.